Generation of Energy by Wind at Nyala

Name of Project:

Generation of Energy by Wind at Nyala.

Location:

Nyala town – Southern Darfur State

Project Description :

Installation of two generation units in two stages. The first is with a capacity of 1.5 mgw; and the second stage is with a capacity of 2 mgw.

Present situation :

The feasibility study had been prepared by Lahmere Consultancy Co. (German.)

Total Cost :

The first stage: US$ 2 millions; and the second stage: US $ 2.7 millions.

Implementation Period :

2 years.

Objectives :

-         The introduction of the new and renewable energy system.

-         Increase of the Western network.

-         Maintaining the stability of the electric current.

Contact Address:

The National Electricity Corporation,

The Planning General Administration,

Tel : 771359/ 776321.

e-mail: osman@necsudan.com

 

New Generation at Bagair

Name of Project:

New Generation at Bagair.

Location:

El-Gezira State, Al-Bagair area, 42 kms from the centre of Khartoum.

Project Description :

Installation of generation unit with the capacity of 300 mgw and linking it to the national network, according to the BOT system, for an agreed period of 25 years.

Present situation :

The land is ready and is owned by the National Electricity Corporation.

Implementation Period :

3 years.

Objectives :

-         Continuous current for the neighbouring GIAD Industrial Area.

-         Meeting the increasing demand on electricity, because of the residential expansion in Khartoum (the capital) area.

Contact Address:

The National Electricity Corporation,

The Planning General Administration,

Tel : 771359/ 776321.

e-mail: osman@necsudan.com

 

 

  

Al-Shiraik Dam

Name of Project:

Al-Shiraik Dam

Location:

River Nile State

Project Description :

The Project is formed from the construction of Al-Shiraik Dam on the River Nile, at the fifth cataract, the construction of an electricity generation station attached to it, with a capacity of 315 mgw, electricity transmission lines of 220 kv, from Al-Shiraik to Khartoum, transformer stations at Atbara, Shendi and Khartoum North, resettlement of those affected by the project and establishment of agricultural projects for them.

Present situation :

The feasibility studies and the engineering designs are ready.

Implementation Period :

5 years.

Objectives :

-      Addition of new hydro-electric generation system in the River Nile State and linking it to the national network, to meet the increasing demand for electric energy.

-      Increasing the dependability of the electric supply.

-      Benefiting from the potential cheep hydro-electric energy at the fifth cataract of the River Nile.

Contact Address:

The National Electricity Corporation,

The Planning General Administration,

Tel : 771359/ 776321.

e-mail: osman@necsudan.com

 

Reinforcing the Destribution Network in the centre of Khartoum

Name of Project:

Reinforcing the Destribution Network in the centre of Khartoum.

Location:

Khartoum (The Capital )

Project Description :

Addition of 2 x 35 mgv ampere and 110/33/11 kv transformer to Al-Ghaba 110/33/11 kv.

Present situation :

The project is included in the plan of the National Electricity Corporation and there are feasibility studies at the Planning Secretariat at the Ministry.

Total Cost :

US $ 19 millions.

Implementation Period :

One years.

Objectives :

-         Meeting the increasing demand for energy in the area.

-         Making the maximum benefit of the available generation in the network (i.e. effective network distribution).

-         Increase of sales.

-         Curbing programmed and unprogr-ammed black-outs and electricity cuts.

Contact Address:

The National Electricity Corporation,

The Planning General Administration,

Tel : 771359/ 776321.

e-mail: osman@necsudan.com

 

 

 

Transmission Line 220 kv, from Rabak to El-Obied.

Name of Project:

Transmission Line 220 kv, from Rabak to El-Obied.

Location:

Kordofan and White Nile States.

Project Description :

Transmission line 220 k.v. from Rabak to El-Obied; and a transformer station 220/33/11 kv at El-Obied.

Present situation :

The Project is included in the National Electricity Corporation plan for the expansion of the national network.

Total Cost :

US $ 70 millions.

Implementation Period :

3 years.

Objectives :

-         Transmission of electric energy from the national network, to Kordofan State,

-         Meeting the increasing demand on energy in the industrial and agricultural fields.

Contact Address:

The National Electricity Corporation,

The Planning General Administration,

Tel : 771359/ 776321.

e-mail: osman@necsudan.com

 

 

 

Khartoum New Airport

Name of Project:

Khartoum New Airport

Location:

Khartoum state

Project description :

Establishment of an airport with high technical qualifications matching the international airports and according with the qualifications of the International Civil Aviation Organization (ICAO)

Total Cost :

About US D 236 million

Contact Address:

Ministry of Aviation,

The Public Corporation for Civil Aviation,

Department of Planning.

Tel : 0249-183-773778

 

Port Sudan Airport

Name of Project:

Port Sudan Airport

Location:

Port Sudan town

Project description :

Development of the airport so as to Operate as a substitute for the existing Khartoum International airport.

Total Cost :

About US D 2 million

Contact Address:

Ministry of Aviation,

The Public Corporation for Civil Aviation,

Department of Planning.

Tel : 0249-183-773778

 

Air Radar System

Name of Project:

Air Radar System

Location:

Khartoum town

Project description :

Promotion and development of Air forecasting and other sectors.

Total Cost :

About US D 2,5 million

Contact Address:

Ministry of Aviation,

The Public Corporation for Civil Aviation,

Department of Planning.

Tel : 0249-183-773778

 

Malakal Airport

Name of Project:

Malakal Airport

Location:

Town of Malakal

Project description :

Rehabilitation of the airport to make it similar to other airports because of its military and Service significance.

Total Cost :

About US D 4 million

Contact Address:

Ministry of Aviation,

The Public Corporation for Civil Aviation,

Department of Planning.

Tel : 0249-183-773778

 

Abu Gibieha Airport

Name of Project:

Abu Gibieha Airport

Location:

Southern Kordofan State

Project description :

Establishment of the airport and establishment of fruits refrigeration stores as, the area is characterized with abundancy of production of fruits and vegetables, wildlife and fantastic picturesque areas for tourist, which were not yet utilized due to the shortage of speedy means of transport, which in turn attributed to the unavailability of infrastructures.

Total Cost :

About US D 14 million

Contact Address:

Ministry of Aviation,

The Public Corporation for Civil Aviation,

Department of Planning.

Tel : 0249-183-773778

 

Osaif Iron Ore Export Port.

The Project:

Osaif Iron Ore Export Port.

Location:

Osaif region, 260 kms North of Port Sudan town.

Project Description:

The construction of a dock with a length of 320 meters and 16/20 meters deep, which may house ships of 70-100 thousands tons load, in addition to  handling equipment.

Current situation:

The project is included in the corporations plan for the export of iron ore and other metals.

Estimated Cost:

US$D 20 millions.

Implementation Period:

18 months.

Objectives:

  • Receiving ships of 70-100 thousands tons load.
  • Export of iron ore and other metals.
  • Encouragement of tourism.
  • Development of the fishing, shells and the Kokian industries.

The Resulting Benefits:

-      The establishing of a specialized port for the transport of iron ore, the marketing of raw iron in the far East and European markets and the development of the region by exploiting its wealth of raw materials and the other resources of the Red Sea.

Contact Address:

Sea Ports Corporation,

Tel : 22799 – 22161 – 22250

Fax: 00249-3118-39383

 

E-mail:spcp@sudanmail.net

           

 

The New Suwakin Port

Project:

The New Suwakin Port

Location:

The Project is located at (Akwai) region, at a distance of (45) kms to the South of Port Sudan town.

Project Description:

Establishment of a specialized port for handling containers at (Akwai) harbour. 

Current Situation:

The project is included in the Corporation’s plan to meet the growth in the volume of transport by containers.

Estimate Cost:

US $ 60 millions. (the first stage = construction of two docks.)

Implementation Period:

18 months

Objectives:

  • Receiving the containers ships of determined specifications of the fifth generation.
  • Offering port services to the Red Sea Free Zone.
  • Addition of areas for storage of containers.
  • Meeting the increasing demand for the use of containers in transport.
  • Serving the purposes of the free zone.

The

Resulting :

Benefits: the increase of export and import movement by containers and the contribution of the raising the absorption capacity of the Sudanese ports.

Contact Address :

The Sea Ports Corporations,

Tel : 22799 – 22161 – 22250

Fax : 00249/3118/39383

E-mail:spcp@sudanmail.net

       

 

Establishment of the Green Area Docks Project (The second stage.)

Project:

Establishment of the Green Area Docks Project (The second stage.)

 

Location:

The project is located in the South–Eastern side of Port Sudan Port.

 

Project Description:

The project is constituted of establishing a dock with a length of (200 meters) and a depth of 14.5m2.); in addition to a storage area behind the dock of about (200m2) for the accommodation of ship of (50 thousands tons), which shall be specified for handling the loose grains exports. 

Current Situation:

The project is included in the plan for developing the Sea Ports Corporation.

Estimate Cost:

US $ 20 millions. (the estimated cost for the deepening and construction of the dock.).

Implementation Period:

18 months

Objectives:

  • Expansion in the construction of docks and ports, on the light of the economic changes; such as, the application of the economic openness, export of petroleum and the expectations of the World Trade Agreement.

The

Resulting

Benefits :

-   Providing docks for receiving ships of 50-60 thousands tons load.

-   The safeguarding of the Sudan’s exports and import movement, by not depending on one port.

-   The allocation of a site inside the port for the construction of grain silos and cement stores.

-   Absorption of the expected changes in the ports movement.

Contact Address :

The Sea Ports Corporations,

Tel : 22799 – 22161 – 22250

Fax : 00249/3118/39383

E-mail:spcp@sudanmail.net

           

 

 

Cattle and Fish Wealth Specialized Export Project Suwakin 

Project:

Cattle and Fish Wealth Specialized Export Project Suwakin.

Location:

Suwakin

Project Description:

The Construction of a specialized port for the export of cattle and fish wealth.

Current Situation:

The project is included in the Quarter Century plan of the Corporation.

Estimate Cost:

US $ 15 millions.

Implementation Period:

36 months

Objectives:

-         Construction of a specialized port for the export of cattle.

-         Offering distinguished services for marketing cattle exports.

-         Meeting the regional and international market requirements.

-         Making use of the fish wealth.

 

 

Contact Address :

The Sea Ports Corporations,

Tel : 22799 – 22161 – 22250

Fax : 00249/3118/39383

E-mail:spcp@sudanmail.net

 

 